Managing Productivity in Construction : JIT Operations and Measurements (Routledge Revivals)

347.90 SGD
Member Price
313.11
English

Product Description

First published in 1997, this volume joined the debate assessing the potential of the Just-In-Time management philosophy from the manufacturing industry for Singapore’s construction industry by examining the "off-site" prefabrication of precast concrete components in Singapore, in comparison with traditional management systems. In the wake of the 1991 Strategic Economic Plan of Singapore, which forecasted alarmingly low productivity in the local construction sector, the authors noted that construction in Japan was 35% more productive, whilst Finland was 75% better. Highlighting immense potential for the JIT approach, they explore the JIT philosophy, traditional systems, construction wastes and comparisons between construction and manufacturing.

First published in 1997, this volume joined the debate assessing the potential of the Just-In-Time management philosophy from the manufacturing industry for Singapore’s construction industry by examining the "off-site" prefabrication of precast concrete components in Singapore, in comparison with traditional management systems.

Available to Order

Usually dispatches within 3-4 weeks

While every attempt has been made to ensure stock availability, occasionally we may run out of stock at our stores.

Free domestic shipping on orders over 50.00SGD

Discount is applied at checkout.

Recently Viewed Items

Related Products